EREN has a wide variety of completed EPCM projects
RIYADH WATER TRANSMISSION SYSTEM / SAUDI ARABIA
Construction of Terminal Building 35.000 square meter area as EP
CM contractor to Burç-Enka joint venture.
Location Riyadh / Saudi Arabia
Client Ministry of Agriculture and Water
Main Contractor Enka
Description
Water treatment plant with a capacity of 200,000 cu.m per day and related service buildings.
Construction Period October 1979 - July 1983
EREN's Scope of Work
Quality Control Manager
Main Items of Work include; Excavation: 339,000 cu.m, Formwork: 112,000 sqm, Reinforcing: 3050 tons, Concrete: 36,400 cu.m, Steel Structure: 2,400 tons, Cladding: 43,400 tons

IRAQ-TURKEY OIL PIPELINE EXPANSION PROJECT / IRAQ
Construction of Terminal Building 35.000 square meter area as EPCM contractor to Burç-Enka joint venture.
Client State Organization for Oil Projects - SCOP
Project Design TEC-ENET
Turn-Key Contractor Consortium of Enka and TOYO Engineering
Description
Replacement of pumps and motors at the existing stations IT1, IT2. Modification of dispatching center. Extension of the meeting station near the Iraqi- Turkish border and addition of the 4th meter run.
Construction of two new pump stations IT 1A and IT 2A complete with high voltage substation, MV substation, fire fighting/fire alarm system, ie-in of new stations to existing pipeline by a double position stopple operation.Replacement of computer system at IT1, dispatching center and extension and modification of remote control, central control and telecommunication systems. Construction of residential area at IT 1A station.
ater treatment plant with a capacity of 200,000 cu.m per day and related service buildings.
Construction Period March 1983 - October 1984
EREN's Scope of Work Project Management

NAHRAVAN WATER TOWER / IRAQ
Construction of Terminal Building 35.000 square meter area as EPCM contractor to Burç-Enka joint venture.
Location Baghdad / Iraq
Client State Organization for Industrial Development
Project Design TEC-ENET
Main Contractor Enka
Description
Complete design and construction of sand trap, 3 underground reservoirs, pumping stations, generator house,
2 water towers, settling tanks, wastewater tank, compressor house, laying of approx. 25 km. of 400 mm. ductile iron pipes and 40 km. of (50 - 350 mm) service pipes
Operators accommodation facilities, roads with 5,600 sqm asphaltpavement, sewerage system, outdoor lighting, outdoor compact substation, fences, telephone system,
pavement, sewerage system, outdoor lighting, outdoor compact substation, fences, telephone system,fire alarm system, supervisory control centre, radio communication system.
Construction Period August 1984 - March 1983
EREN's Scope of Work Site Management
Main Items of Work Formwork: 24,537 sqm Reinforcing: 695 tons Concrete: 7,123 cu.m

KERBELA CEMENT FACTORY / IRAQ
Construction of Terminal Building 35.000 square meter area as EPCM contractor to Burç-Enka joint venture.
Location Kerbela - Iraq
Client State Organization for Construction Industries - STOKI
Project Design TEC-ENET
Turn-Key Contractor Krupp Polysius A.G./W. Germany
Description
Cement Plant with a capacity of 1,000,000 tons/year (3,000 tons/day of cement clinker in one production line).
Construction Period May 1981 - March 1985
EREN's Scope of Work Project Management
Main Items of Work
Excavation: 147.894 cu.m, Formwork: 95,379, Reinforced steel: 5,185, Sliding formwork: 43,778, Concrete: 46,508, Prestressing wire: 108 tons

BEKHME DAM / IRAQ
Construction of Terminal Building 35.000 square meter area as EPCM contractor to Burç-Enka joint venture.
Location On the greater Zab River, Mosul - Iraq
Client Ministry of Irrigation, State Commission for Dam - SCD
Turn-Key Contractor Enka-Hidrogradnja
Description
Construction of civil works including supply and erection of the hydraulic steel structures for Bekhme Dam project and turn-key housing complex comprising 350 villas in 4 different types and 17 social facilities such as Guest House restaurant, club house, supermarket, dispensary, kindergarten, school, mosque, bank, post office, laundry and offices.
Construction Period September 1986 - August 1990
EREN's Scope of Work Project Management
Main Items of Work
Procurement and logistics Management in Enka Head Office

BERKE DAM / TURKEY
Construction of Terminal Building 35.000 square meter area as EPCM contractor to Burç-Enka joint venture.
Location Adana / Turkey
Client Çukurova Elektrik A.Ş.
Turn-Key Contractor Enka
Description
Berke Dam is designed as a double curvature concrete thin arch dam, 201 m. high from the foundation..
Construction Period
First Phase: August 1990 - October 1992
Second Phase: October 1992 - 1995 (Enka - Italstrade)
EREN's Scope of Work Project Management
Main Items of Work
Cofferdams Excavation: 19,1100 cu.m, Concrete: 28,000, Filling: 68,060
Dam: Rock excavation: 745,500, Consolidation Grouting: 1,200 tons

BERKE DAM DERIVATION TUNNEL AND ACCESS ROADS, TUNNELS AND BRIDGES PROJECT(First Phase)
C


onstruction Period
January 1992



KUMTOR GOLD MINE PROJECT / KYRGYZSTAN
Construction of Terminal Building 35.000 square meter area as EPCM contractor to Burç-Enka joint venture.
Location Kumtor - Ashirak Mountain-Kyrgyzstan
Client Kumtor Operating Company
Contractors 1/3 Cameco Corporation 2/3 Kyrgyzstan Government
Description
Kumtor Gold Project is an E.P.C.M. project. The project consists of the Site Services, Mine, Process Plant, Tailings Disposal, Site Roads, Construction Equipment, Power Supply and Marshalling Yard, Roads, Training Facilities and Bishkek Housing and Issyk Kol Housing Facilities
Construction Period (July 1994 - December 1996)
EREN's Scope of Work Project Coordination
Main Items of Work
Total no of drawings: 1500 Total value of purchase orders: US $ 186 million Direct & Indirect man hours: 2.740.800 hr Earthworks cut: 2.000.000 cu.m /fill: 3.000.000 cu.m Concrete structural: 24.000 cu.m / lean: 6.000 cu.m Cement: 13.000 tons Reinforcing bar: 5.000 tons Formwork: 17.500 sq.m